September saw all the foundation work finished and the steel work being installed. These pieces, one at each end of the house, will support the upward slops of the butterfly-style roof, with the top openings holding the clerestory windows.
The one in the photo will be at the end of our living room and will also contain a 20 feet wall of glass, with the center 10 feet being sliders that will open on to the patio.
As I write this, the radiant floor heating is being installed and the slab will be poured this week.